An express optic fiber for a political figure

Connexion fibre optique CELESTE

Optic fiber delivery : record time for our teams !

Our teams outdid themselves in order to meet Leonix Events’ request for a temporary optic fiber connection. Our mission was to equip this customer located at 500m from our own fiber network, to the Palais du Pharo, in Marseille, for an event hosted by a political figure. This project required a synergy of our different units to achieve an express delivery due to the urgency of the demand.

Race against the clock for the pulling of 500m of fiber

Our teams carried out the steps of a fiber connection project in a very short time. Part of the work was carried out in the evening with on-site monitoring made possible by our Works Manager (CELESTE Fibre). An exceptional case and a real challenge for our experts.

Palais du Pharo

Organisation, reactivity and synergy of CELESTE teams​

Different teams intervened for the delivery of the temporary internet access :

The DIVOP unit (Operator Division)

Through our DIVOP unit (CELESTE Wholesale), we offer the quality and high availability of our Very High Speed network to telecom operators.

The request of our client Leonix Events was first received and processed by our DIVOP sales representative. Before the vetting of a project, it is essential to consult with the production teams for the delivery of the fiber. These teams are part of the CELESTE Fibre and Operations units.

Vignette remy

Rémy Blanès, Commercial Assistant DIVOP

« I received a call from my client asking me to deliver a fiber for one of their strategic customers. Despite the urgency, my management authorised me to respond favourably and mobilise the necessary internal resources. All this was made possible by the trust of our client Leonix Events and the professionalism of our teams. »

The key teams for the production of CELESTE fiber solution

Before deploying the fiber,

it is necessary to first design the optic route (ROP). This step is essential to identify the scope of work required. This information will then make it possible to define, for example: on how many meters to pull the fiber, what will be the path to the customer’s site or what are the resources needed to deliver the project. CELESTE having its own design office, the optical route (ROP) was created by our designer.

Cyril Cros, Director CELESTE Fibre

« We quickly identified the people involved to deliver the fiber to the customer in record time. We held a few work meetings and activated the right resources at the right time to produce the whole thing : optical route, pop port, garter, cable pulling, welds, router (cpe), delivery document and production launch. This is a success for our client and a new record at CELESTE for a customer connection project. That’s what being professional is all about !  »
vignette stephan b

Stéphan Boissiere, Construction Manager

« As a construction manager, my role was to follow up on site at the Palais du Pharo and make sure there were no blocking points during the deployment. Deliveri